Feasibility Report Preparation for the Treatment of a Tidally-influenced Drain
Client: One of the leading builder
A tidally-influenced drain with leachate from a nearby dumping ground leaking into it – TerraNero prepared a treatment plan envisaging this drain as a flowing water ecosystem.